Nova-tech Chem-Tech Prime Performance Series Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Bombas Nova-tech Chem-Tech Prime Performance Series. Nova-Tech Chem-Tech Prime Performance Series User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
READ ALL CAUTIONS CAREFULLY BEFORE
INSTALLING PUMP
INSTRUCTION
MANUAL
P/N 32040
Rev B
NOTE: Prime Performance Series Addendum starts on page 13
Vista de página 0
1 2 3 4 5 6 ... 14 15

Resumo do Conteúdo

Página 1 - INSTRUCTION

READ ALL CAUTIONS CAREFULLY BEFORE INSTALLING PUMP INSTRUCTION MANUAL

Página 2 - SAFETY INSTRUCTIONS

10 TROUBLESHOOTING PROBLEM PROBABLE CAUSE REMEDY LOSS OF CHEMICAL RESIDUAL 1. Pump setting too low. 2. Scale at injection point 3. Solution contain

Página 5

J32079 Revision B Addendum Chem-Tech Prime Performance Degassing Pump Head Instructions NOTE: Head is for use on 15, 24 and 30 GPD models only!!

Página 6

J32079 Revision B 4. Connect the return tubing to the degas valve on the top of the pump head. 5. Secure the other end of the degas return tubing t

Página 7 -  PRIMING

J32079 Revision B 234NOTE SPRINGORIENTATIONSMALLSPACERLARGESPACERNOTENOTCHON TOP1NOTEARROWIS UPDISCHARGESUCTIONDEGASRETURNNOTE: PRIME PERFORMANCE DEG

Página 8 -  MAINTENANCE:

2 TABLE OF CONTENTS Page SAFETY INSTRUCTIONS ...

Página 9 - SERVICING AND REPAIRS

3 MANUFACTURER’S PRODUCT WARRANTY The manufacturer warrants its equipment of its manufacture to be free of defects in material or workmanship. Liabil

Página 10 - TROUBLESHOOTING

4 10. Standard white polyethylene discharge tubing is not recommended for installations exposed to direct sunlight. Consult supplier for special blac

Página 11

5 Flooded suction mounting Fig. C (installing feeder at the base of tank on a platform) is the most trouble free type of installation. (Tank stands an

Página 12

6  DOWN-THE-WELL INSTALLATION: Often it is desirable to provide chemical feed near the intake of the well pump for additional retention time and mi

Página 13 - Figure 1

7 5. Install the bypass tubing from the kit into the bypass port of the bleed valve and hand tighten the coupling nut. Bypass tubing should be conne

Página 14 - Figure 2

8 All air must be purged from the pump head before the pump will pump against pressure. Turn on the power to the pump. Loosen the locking lever by tur

Página 15 - DISCHARGE

9 7. A setting of "0" will now give zero output. One full revolution of the knob counter clockwise will give maximum output. The knob shoul

Comentários a estes Manuais

Sem comentários